<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xml:lang="ru"><front><journal-meta><journal-id journal-id-type="publisher-id">vestnikvniizht</journal-id><journal-title-group><journal-title xml:lang="ru">Вестник Научно-исследовательского института железнодорожного транспорта (ВЕСТНИК ВНИИЖТ)</journal-title><trans-title-group xml:lang="en"><trans-title>RUSSIAN RAILWAY SCIENCE JOURNAL</trans-title></trans-title-group></journal-title-group><issn pub-type="ppub">2223-9731</issn><issn pub-type="epub">2713-2560</issn><publisher><publisher-name>Joint Stock Company "Railway Research Institute"</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.21780/2223-9731-2025-84-1-60-71</article-id><article-id custom-type="edn" pub-id-type="custom">qoajpo</article-id><article-id custom-type="elpub" pub-id-type="custom">vestnikvniizht-852</article-id><article-categories><subj-group subj-group-type="heading"><subject>Research Article</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="ru"><subject>ТЕХНИЧЕСКИЕ СРЕДСТВА ЖЕЛЕЗНОДОРОЖНОГО ТРАНСПОРТА</subject></subj-group><subj-group subj-group-type="section-heading" xml:lang="en"><subject>TECHNICAL MEANS OF RAILWAY TRANSPORT</subject></subj-group></article-categories><title-group><article-title>О подходах к обоснованию целесообразности изменения геометрии трассы со сложным планом железнодорожных линий</article-title><trans-title-group xml:lang="en"><trans-title>Approaches to substantiating the expediency of changing routing geometry with a complex plan of railway lines</trans-title></trans-title-group></title-group><contrib-group><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-8174-214X</contrib-id><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Мехедов</surname><given-names>М. И.</given-names></name><name name-style="western" xml:lang="en"><surname>Mekhedov</surname><given-names>M. I.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Мехедов Михаил Иванович - канд. техн. наук, первый заместитель генерального директора, ВНИИЖТ.</p><p>129626, Москва, ул. 3-я Мытищинская, д. 10, стр. 1</p><p>Author ID 1019989</p></bio><bio xml:lang="en"><p>Mikhail I. Mekhedov - Cand. Sci. (Eng.), First Deputy General Director, Railway Research Institute.</p><p>129626, Moscow, bldg. 1, 10, 3rd Mytishchinskaya St.</p><p>Author ID 1019989</p></bio><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0009-0000-8288-9322</contrib-id><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Антонец</surname><given-names>В. А.</given-names></name><name name-style="western" xml:lang="en"><surname>Antonets</surname><given-names>V. A.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Антонец Владимир Александрович - аспирант, начальник Забайкальской ЖД — филиала ОАО «РЖД».</p><p>672000, Чита, Ленинградская, д.34</p></bio><bio xml:lang="en"><p>Vladimir A. Antonets - Postgraduate, Head of the TransBaikal Railway — branch of JSC “Russian Railways”.</p><p>672000, Chita, 34, Leningradskaya St.</p></bio><xref ref-type="aff" rid="aff-2"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0009-0008-3897-0113</contrib-id><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Устинов</surname><given-names>В. А.</given-names></name><name name-style="western" xml:lang="en"><surname>Ustinov</surname><given-names>V. A.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Устинов Владимир Александрович - аспирант, технический эксперт НЦ «ЦМПЭ», ВНИИЖТ.</p><p>129626, Москва, ул. 3-я Мытищинская, д. 10, стр. 1</p><p>Author ID 1141173</p></bio><bio xml:lang="en"><p>Vladimir A. Ustinov - Postgraduate, Technical Expert, Digital Models of Transportation and Energy Saving Technologies Research Centre, Railway Research Institute.</p><p>129626, Moscow, bldg. 1, 10, 3rd Mytishchinskaya St.</p><p>Author ID 1141173</p></bio><email xlink:type="simple">ustinov.vladimir@vniizht.ru</email><xref ref-type="aff" rid="aff-1"/></contrib><contrib contrib-type="author" corresp="yes"><contrib-id contrib-id-type="orcid">https://orcid.org/0000-0002-2827-1991</contrib-id><name-alternatives><name name-style="eastern" xml:lang="ru"><surname>Федулин</surname><given-names>В. Г.</given-names></name><name name-style="western" xml:lang="en"><surname>Fedulin</surname><given-names>V. G.</given-names></name></name-alternatives><bio xml:lang="ru"><p>Федулин Вячеслав Геннадьевич - аспирант, технический эксперт НЦ «ЦМПЭ», ВНИИЖТ.</p><p>129626, Москва, ул. 3-я Мытищинская, д. 10, стр. 1</p><p>Author ID 1141172</p></bio><bio xml:lang="en"><p>Vyacheslav G. Fedulin - Postgraduate, Technical Expert, Digital Models of Transportation and Energy Saving Technologies Research Centre, Railway Research Institute.</p><p>129626, Moscow, bldg. 1, 10, 3rd Mytishchinskaya St.</p><p>Author ID 1141172</p></bio><xref ref-type="aff" rid="aff-1"/></contrib></contrib-group><aff-alternatives id="aff-1"><aff xml:lang="ru"><institution>Научно-исследовательский институт железнодорожного транспорта (ВНИИЖТ)</institution><country>Россия</country></aff><aff xml:lang="en"><institution>Railway Research Institute</institution><country>Russian Federation</country></aff></aff-alternatives><aff-alternatives id="aff-2"><aff xml:lang="ru"><institution>Забайкальская железная дорога — филиал ОАО «РЖД»</institution><country>Россия</country></aff><aff xml:lang="en"><institution>TransBaikal Railway</institution><country>Russian Federation</country></aff></aff-alternatives><pub-date pub-type="collection"><year>2025</year></pub-date><pub-date pub-type="epub"><day>28</day><month>03</month><year>2025</year></pub-date><volume>84</volume><issue>1</issue><fpage>60</fpage><lpage>71</lpage><permissions><copyright-statement>Copyright &amp;#x00A9; Мехедов М.И., Антонец В.А., Устинов В.А., Федулин В.Г., 2025</copyright-statement><copyright-year>2025</copyright-year><copyright-holder xml:lang="ru">Мехедов М.И., Антонец В.А., Устинов В.А., Федулин В.Г.</copyright-holder><copyright-holder xml:lang="en">Mekhedov M.I., Antonets V.A., Ustinov V.A., Fedulin V.G.</copyright-holder><license xml:lang="ru" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>Данная работа распространяется под лицензией Creative Commons Attribution 4.0.</license-p></license><license xml:lang="en" license-type="creative-commons-attribution" xlink:href="https://creativecommons.org/licenses/by/4.0/" xlink:type="simple"><license-p>This work is licensed under a Creative Commons Attribution 4.0 License.</license-p></license></permissions><self-uri xlink:href="https://www.journal-vniizht.ru/jour/article/view/852">https://www.journal-vniizht.ru/jour/article/view/852</self-uri><abstract><sec><title>Введение</title><p>Введение. В статье рассмотрены проблемы обеспечения надежной работы верхнего строения железнодорожного пути в кривых малого радиуса на примере наиболее грузонапряженных участков Транссибирской магистрали. Основной целью является разработка методики проведения сравнительного анализа участков, находящихся в разных условиях эксплуатации по критериям плана железнодорожной линии и длины участка. Это позволит оценивать целесообразность изменения плана железнодорожной линии криволинейных участков. В исследовании были использованы параметры: показатели выхода остродефектных рельсов, наличие ограничений скорости 15 и 25 км/ч, затраты времени на ремонт и текущее содержание пути за период эксплуатации от последнего капитального ремонта железнодорожного пути.</p></sec><sec><title>Материалы и методы</title><p>Материалы и методы. Использованы результаты анализа показателей изъятия из эксплуатации остродефектных рельсов, выдачи ограничений скорости, а также фактического предоставления «окон» для ремонта и текущего содержания путевой инфраструктуры на участках с различными условиями эксплуатации за истекший период жизненного цикла железнодорожного пути. Исходные данные для исследования получены из автоматизированных информационных систем ОАО «РЖД».</p></sec><sec><title>Результаты</title><p>Результаты. Проведенным исследованием установлена зависимость факторов, негативно влияющих на эксплуатационную работу участка железнодорожной линии, от параметров плана железнодорожного пути. Полученные данные сравнительного анализа показали значительное превышение объемов работ по ремонту и текущему содержанию пути, выхода остродефектных рельсов и наличия лимитирующих ограничений скорости на участке, рассматриваемом для изменения плана железнодорожной линии, по сравнению с участком, аналогичным выбранному варианту проекта спрямления.</p></sec><sec><title>Обсуждение и заключение</title><p>Обсуждение и заключение. Результаты исследования могут быть рекомендованы к использованию в качестве одного из разделов технико-экономического обоснования целесообразности изменения геометрии трассы участков с неблагоприятными эксплуатационными условиями, связанными с параметрами плана железнодорожной линии.</p></sec></abstract><trans-abstract xml:lang="en"><sec><title>Introduction</title><p>Introduction. The subject of the study is the problems of ensuring reliable operation of the railway track superstructure in small radius curves on the example of the most heavy-trafﬁc sections of the Trans-Siberian railroad. The main purpose is to create a comparative analysis methodology of sections under different operating conditions according to the criteria of railroad line layout and section length, which would enable to assess the feasibility of changing the layout of the railway line of curved sections. The parameters of the study include indices of a critical faulty rails output, presence of speed limits of 15 and 25 km/h, actual time expenditures for repair and current maintenance of the track for the period of operation after the last major repair.</p></sec><sec><title>Materials and methods</title><p>Materials and methods. The author employed results of the analysis of actual indicators of withdrawal of critical faulty rails from operation, issuance of speed limits, actual provision of break for repair and current maintenance of railway track on sections with different operating conditions for the elapsed period of the life cycle. The source data for the study were obtained from the automated systems of JSC “Russian Railways”.</p></sec><sec><title>Results</title><p>Results. The conducted research established dependence of the factors negatively inﬂuencing the operational work of the railway line section on the parameters of its layout. The obtained data of the comparative analysis showed a signiﬁcant excess of the volume of works on repair and current track maintenance, the output of critical faulty rails and the presence of limiting speed restrictions on the section considered for changing the alignment in comparison with the section similar to the selected variant of the straightening project.</p><p>Discussion and conclusion. The results of the study could be recommended for use as one of the sections of the feasibility study of the expediency of changing in the track sections routing geometry with unfavorable operating conditions related to the parameters of the layout of the railway line.</p></sec></trans-abstract><kwd-group xml:lang="ru"><kwd>грузонапряженность</kwd><kwd>пропущенный тоннаж</kwd><kwd>кривые участки пути</kwd><kwd>ограничения скорости движения поездов</kwd><kwd>дефекты рельсов</kwd><kwd>план железнодорожной линии</kwd></kwd-group><kwd-group xml:lang="en"><kwd>trafﬁc density</kwd><kwd>passed tonnage</kwd><kwd>curved track</kwd><kwd>train speed restrictions</kwd><kwd>rail defects</kwd><kwd>layout of the railway line</kwd></kwd-group><funding-group><funding-statement xml:lang="ru">Авторы выражают благодарность рецензентам за полезные замечания, способствовавшие улучшению статьи.</funding-statement><funding-statement xml:lang="en">The authors express gratitude to the reviewers for useful comments that contributed to the improvement of the article.</funding-statement></funding-group></article-meta></front><back><ref-list><title>References</title><ref id="cit1"><label>1</label><citation-alternatives><mixed-citation xml:lang="ru">Хобта А.В. Изыскательские и проектные работы для Транссибирской магистрали (1880-е–1910-е гг.). Тверь: ТФП, 2017. 400 с.</mixed-citation><mixed-citation xml:lang="en">Hobta A.V. Survey and design work for the Trans-Siberian Railway (1880-s–1910-s). Tver: TFP Publ, 2017. 400 p. (In Russ.).</mixed-citation></citation-alternatives></ref><ref id="cit2"><label>2</label><citation-alternatives><mixed-citation xml:lang="ru">Иванова М.А., Маслова Е.Н., Токмаков В.С. Первые изыскания и экспедиционные исследования при проектировании и строительстве Амурской железной дороги в 1893–1911 годы // Международный журнал гуманитарных и естественных наук. 2023. № 5–2 (80). С. 18–23. EDN: https://elibrary.ru/takbxt.</mixed-citation><mixed-citation xml:lang="en">Ivanova M.A., Maslova E.N., Tokmakov V.S. The ﬁrst surveys and expedition research during the design and construction of the Amur railway in 1893-1911. International Journal of Humanities and Natural Sciences. 2023;5–2(80):18–23. (In Russ.). EDN: https://elibrary.ru/takbxt.</mixed-citation></citation-alternatives></ref><ref id="cit3"><label>3</label><citation-alternatives><mixed-citation xml:lang="ru">Быков Ю.А., Васильев А.Б., Гавриленков А.А., Фадеева В.А. Оптимизация топологии Забайкальской железной дороги // Бюллетень Объединенного ученого совета ОАО «РЖД». 2017. №3. С. 55–62. EDN: https://elibrary.ru/zizpgp.</mixed-citation><mixed-citation xml:lang="en">Bykov Yu.A., Vasil’iev A.B., Gavrilenkov A.A., Fadeeva V.A. Optimization of the Trans-Baikal railway topology. Bulletin of the Joint Scientiﬁc Council of JSC “Russian Railways”. 2017;(3):55–62. (In Russ.). EDN: https://elibrary.ru/zizpgp.</mixed-citation></citation-alternatives></ref><ref id="cit4"><label>4</label><citation-alternatives><mixed-citation xml:lang="ru">Едигарян А.Р. Основы методологии формирования генеральной схемы этапной реконструкции геометрии трассы существующего железнодорожного направления / А.Р. Едигарян, С.М. Гончарук, А.И. Нератов // Современные технологии. Системный анализ. Моделирование. 2013. №3(39). С. 294–299. EDN: https://elibrary.ru/rchogx.</mixed-citation><mixed-citation xml:lang="en">Edigaryan A.R., Goncharuk S.M., Neratov A.I. Methodological principles of formation of the general scheme phased modernization of the existing railway track geometry. Modern Technologies. System analysis. Modeling. 2013;3(39):294–299. (In Russ.). EDN: https://elibrary.ru/rchogx.</mixed-citation></citation-alternatives></ref><ref id="cit5"><label>5</label><citation-alternatives><mixed-citation xml:lang="ru">Едигарян А.Р., Оголец А.А. Варианты ликвидации кривых малого радиуса на перегоне Ерофей Павлович — Большая Омутная Забайкальской железной дороги // Проектирование развития региональной сети железных дорог: сб. науч. тр. Хабаровск: Изд-во ДВГУПС, 2016. Вып. 4. С. 411–415. EDN: https://elibrary.ru/xeexyv.</mixed-citation><mixed-citation xml:lang="en">Edigaryan A. R. Ogolets A.A. Options for the elimination horseshoe curves on the section Erofey Pavlovich — Bolshaya Omutnaya Zabaikal Railways. In: Designing the development of the transport network of the Far East: collection of scientiﬁc works. Khabarovsk: DvGUPS Publ; 2016;(4):411–415. (In Russ.). EDN: https://elibrary.ru/xeexyv.</mixed-citation></citation-alternatives></ref><ref id="cit6"><label>6</label><citation-alternatives><mixed-citation xml:lang="ru">Едигарян А.Р., Нератов А.И., Гончарук С.М., Васильев А.Б. Разработка генеральной схемы реконструкции геометрии трассы на примере Шилкинской и Сковородинской дистанций пути Забайкальской железной дороги. // Проектирование развития региональной сети железных дорог: сб. науч. тр. Хабаровск: Изд-во ДВГУПС, 2013. Вып. 1. С. 21–36. EDN: https://elibrary.ru/tcwtgv.</mixed-citation><mixed-citation xml:lang="en">Edigaryan A. R., Neratov A. I., Goncharuk S. M., Vasil’yev A. B. Development of a general scheme for the reconstruction of the route geometry using the example of the Shilkinskaya and Skovorodinskaya distances of the Trans-Baikal railway. In: Designing the development of the transport network of the Far East: collection of scientiﬁc works. Khabarovsk: DvGUPS Publ; 2013;(1):21–36. (In Russ.). EDN: https://elibrary.ru/tcwtgv.</mixed-citation></citation-alternatives></ref><ref id="cit7"><label>7</label><citation-alternatives><mixed-citation xml:lang="ru">Быков Ю.А., Васильев А.Б., Целихов Е.О., Едигарян А.Р. Технико-экономическая эффективность улучшения трассы особогрузонапряженных магистралей // Проектирование развития региональной сети железных дорог: сб. науч.тр. Хабаровск: Изд-во ДВГУПС, 2019. Вып. 7. С. 34–41. EDN: https://elibrary.ru/ppfovz.</mixed-citation><mixed-citation xml:lang="en">Bykov Yu.A., Vasil’ev A.B., Tselikhov E.O., Edigarian A.R. Feasibility study for improving the route of specially loaded railway lines. In: Designing the development of the transport network of the Far East: collection of scientiﬁc works. Khabarovsk: DvGUPS Publ; 2019;(7):34–41. (In Russ.). EDN: https://elibrary.ru/ppfovz.</mixed-citation></citation-alternatives></ref><ref id="cit8"><label>8</label><citation-alternatives><mixed-citation xml:lang="ru">Ушакова М.В., Линейцев В.Ю. Спрямление трассы железной дороги на перегоне Сохондо–Лесная // Транссиб на острие реформ: сб. науч. тр. Чита: Изд-во ЗабИЖТ, 2016. Том 1. С. 121–125. EDN: https://elibrary.ru/wwbftp.</mixed-citation><mixed-citation xml:lang="en">Ushakova M. V., Lineitsev V.Yu. Straightening of the railway route on the Sokhondo — Lesnaya section. In: Transsib: at the forefront of reforms: collection of scientiﬁc works, 06–07 October, 2016, Chita. Chita: ZabIZHT Publ; 2016. Vol. 1. P. 121–125. (In Russ.). EDN: https://elibrary.ru/wwbftp.</mixed-citation></citation-alternatives></ref><ref id="cit9"><label>9</label><citation-alternatives><mixed-citation xml:lang="ru">Целихов Е.О., Кожевников В.В. Экономическая эффективность спрямления трассы железнодорожной линии // Сборник научных статей аспирантов РУТ (МИИТ). Том Вып. 4. Под общей редакцией Т.В. Шепитько. Москва, 2021. С. 281–288. EDN: https://elibrary.ru/naqqqc.</mixed-citation><mixed-citation xml:lang="en">Tselikhov E.O., Kozhevnikov V.V. Economic eﬃciency of straightening the railway line route. In: Shepit’ko T.V. (gen. ed.) Collection of scientiﬁc articles by graduate students of RUT (MIIT), Moscow, 2021. Vol. Issue 4. P. 281–288. (In Russ.). EDN: https://elibrary.ru/naqqqc.</mixed-citation></citation-alternatives></ref><ref id="cit10"><label>10</label><citation-alternatives><mixed-citation xml:lang="ru">Линейцев В.Ю. Спрямление трассы железной дороги, как эффективная мера по увеличению ее пропускной и провозной способности. // Транссиб: на острие реформ: сб. науч. тр., 06–07 октября 2016 года. Чита: Изд-во ЗабИЖТ, 2016. Том 1. С. 82–86. EDN: https://elibrary.ru/wwbfrh.</mixed-citation><mixed-citation xml:lang="en">Lineitsev V.Yu. Straightening of the railway route as an eﬀective measure to increase its throughput and carrying capacity. In: Transsib: at the forefront of reforms: collection of scientiﬁc works, 06–07 October, 2016, Chita. Chita: ZabIZHT Publ; 2016. Vol. 1. p. 82-86. (In Russ.). EDN: https://elibrary.ru/wwbfrh.</mixed-citation></citation-alternatives></ref></ref-list><fn-group><fn fn-type="conflict"><p>The authors declare that there are no conflicts of interest present.</p></fn></fn-group></back></article>
