Preview

RUSSIAN RAILWAY SCIENCE JOURNAL

Advanced search

Methodological approaches to the efficient functioning assessment of the modern upper structure track

https://doi.org/10.21780/2223-9731-2022-81-1-80-88

Abstract

Introduction. The article covers the approaches to assessing the efficient functioning of the modern upper structure track and aims at developing these approaches in the process of using the track superstructure materials — rails, fasteners, sleepers, ballast — under given operating conditions.

Materials and methods. The authors proposed methodological approaches for assessing the effective functioning of the modern upper structure track. These methods were based on the life cycle cost measurements of railway complex technical systems. The methodological approaches enable to consider the expenditures for the acquisition, possession and disposal of the upper structure track materials by discounting the cost indicators and the initial period value.

Results. The authors present the results of test calculations for assessing the effective use of ZhBR-65PShM, ZhBR-65Sh, ARS-4, Vossloh W-30 rail fasteners types on a 12-kilometer nominal section of the continuous welded rail with DT350 rails and a traffic density up to 80 t.km gross/km per year. The most efficient upper structure track option is the one, which has the lowest value of unit costs per 1 t.km gross and covers the full life cycle of the railway track section operation.

Discussion and conclusion. The developed methodological approaches will be used to evaluate, compare and select the most efficient upper structure track schemes under given operating conditions.

About the Authors

E. N. Efimova
Railway Research Institute (VNIIZhT)
Russian Federation

Elena N. EFIMOVA, Cand. of Sci. (Economics), Director of the Research Center “Economics of Complex Projects and Tariff Setting”

SPIN-code: 7176-0100, AuthorID: 699691

Moscow



N. P. Vinogorov
Railway Research Institute (VNIIZhT)
Russian Federation

Nikolay P. VINOGOROV (1939–2021), Cand. of Sci. (Engineering), Leading Researcher, Research Center “Track Infrastructure and Issues of Wheel — Rail Interaction”

Moscow



A. A. Shiladzhyan
Railway Research Institute (VNIIZhT)
Russian Federation

Alla A. SHILADZHYAN, Cand. of Sci. (Engineering), Leading Researcher, Research Center “Rails, Welding, Transport Materials Science“

Moscow



V. M. Koshelev
Railway Research Institute (VNIIZhT)
Russian Federation

Vladimir M. KOSHELEV, Cand. of Sci. (Engineering), Business Analyst, Research Center “Economics of Complex Projects and Tariff Setting”

Moscow



D. A. Valov
Railway Research Institute (VNIIZhT)
Russian Federation

Dmitriy A. VALOV, Business Analyst, Research Center “Economics of Complex Projects and Tariff Setting”

Moscow



N. V. Kuznetsova
Russian Open Academy of Transport (ROAT) of the Russian University of Transport (RUT (MIIT)
Russian Federation

Natal'ya V. KUZNETSOVA, Senior Lecturer, Department of Transport Construction

SPIN-code: 6276-9288, AuthorID: 1115600

Moscow



References

1. Metodika rascheta stoimosti zhiznennogo tsikla 1 km zheleznodorozhnogo puti s razlichnymi tipami skrepleniy v zavisimosti ot usloviy ekspluatatsii [Methodology for calculating the cost of the life cycle of 1 km of railway track with different types of fastenings depending on the operating conditions]: utv. rasporyazheniem OAO “RZhD” ot 28 dekabrya 2018 g. № 2843/r. [approved by Order of JSC Russian Railways dated December 28, 2018 No. 2843/r]. (In Russ.).

2. Tekhniko-ekonomicheskoe obosnovanie po primeneniyu razlichnykh konstruktsiy skrepleniy [Feasibility study on the use of various designs of fasteners]: utv. rasporyazheniem OAO “RZhD” ot 29 dekabrya 2018 g. № 2848/r. [approved by Decree of JSC Russian Railways dated December 29, 2018 No. 2848/r]. (In Russ.).

3. Bel'tyukov V. P., Tret'yakov A. A. Ispol'zovanie stoimosti zhiznennogo tsikla dlya optimizatsii tekhnicheskogo obsluzhivaniya verkhnego stroeniya puti [Use of the life cycle cost for optimizing the maintenance of track superstructure]. Izvestiya Peterburgskogo gosudarstvennogo universiteta putey soobshcheniya = Proceedings of Petersburg Transport University. 2015;3: 42–47. (In Russ.).

4. Bel'tyukov V. P., Andreev A. V. Osobennosti opredeleniya stoimosti zhiznennogo tsikla verkhnego stroeniya puti na uchastkakh s raznymi usloviyami ekspluatatsii [Features of determining the cost of the life cycle of the upper structure of the track in areas with different ope rating conditions]. Izvestiya Peterburgskogo gosudarstvennogo universiteta putey soobshche niya = Proceedings of Petersburg Transport University. 2016;3:314–320. (In Russ.).

5. Metodika opredeleniya stoimosti zhiznennogo tsikla i limitnoy tseny podvizhnogo sostava i slozhnykh tekhnicheskikh sistem zheleznodorozhnogo transporta (osnovnye polozheniya) [Methodology for determining the cost of the life cycle and the limit price of rolling stock and complex technical systems of railway transport (Main provisions)]: utv. rasporyazheniem OAO “RZhD” ot 27 dekabrya 2007 g. № 2459r [approved by Order of JSC Russian Railways dated December 27, 2007 No. 2459r]. URL: https://jd-doc.ru/2007/dekabr-2007/12704-rasporyazhenie-oaorzhd-ot-27-12-2007-n-2459r (access date: 20.06.2021). (In Russ.).

6. STO RZhD 02.037–2011. Upravlenie resursami, riskami i nadezhnost'yu na etapakh zhiznennogo tsikla (URRAN). Upravlenie stoimost'yu zhiznennogo tsikla sistem, ustroystv i oborudovaniya khozyaystv OAO “RZhD” [Management of resources, risks and reliability at the stages of the life cycle (URRAN). Management of the life cycle cost of systems, devices and equipment of JSC Russian Railways]: utv. rasporyazheniem OAO “RZhD” ot 22 marta 2012 g. № 560r [approved by Order of JSC Russian Railways dated March 22, 2012 No. 560r]. URL: http://oac.rgotups.ru/misc/files/prof_risk/sto_rzd_.pdf (access date: 20.06.2021). (In Russ.).

7. O vnesenii izmeneniy v Pravila tekhnicheskoy ekspluatatsii zheleznykh dorog Rossiyskoy Federatsii, utverzhdennykh prikazom Ministerstva transporta Rossiyskoy Federatsii ot 21 dekabrya 2010 g. № 286 [On amendments to the Rules for the technical operation of railways of the Russian Federation, approved by order of the Ministry of Transport of the Russian Federation dated December 21, 2010 No. 286]: prikaz Mintransa Rossii ot 9 fevralya 2018 g. № 54 [Order of the Ministry of Transport of Russia of February 9, 2018 No. 54]. URL: http://publication.pravo. gov.ru/Document/View/0001201805030055 (access date: 20.06.2021). (In Russ.).

8. Normativy chislennosti rabotnikov, zanyatykh na tekushchem soderzhanii zheleznodorozhnogo puti [Standards for the number of employees employed on the current maintenance of the railway track]: utv. rasporyazheniem OAO “RZhD” ot 26 dekabrya 2016 g. № 2667r [approved by Order of JSC Russian Railways dated December 26, 2016 No. 2667r]. (In Russ.).


Review

For citations:


Efimova E.N., Vinogorov N.P., Shiladzhyan A.A., Koshelev V.M., Valov D.A., Kuznetsova N.V. Methodological approaches to the efficient functioning assessment of the modern upper structure track. RUSSIAN RAILWAY SCIENCE JOURNAL. 2022;81(1):80-88. (In Russ.) https://doi.org/10.21780/2223-9731-2022-81-1-80-88

Views: 534


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2223-9731 (Print)
ISSN 2713-2560 (Online)