Setting of conditions for handling electric multiple units “Lastochka”
https://doi.org/10.21780/2223-9731-2016-75-4-248-255
Abstract
About the Authors
A. M. BrzezhovskiyRussian Federation
D. N. Arshintsev
Russian Federation
I. V. Smelyanskiy
Russian Federation
S. V. Tolmachev
Russian Federation
D. E. Kiryushin
Russian Federation
References
1. A. Lipp, W. Löbe. Triebfahrzeu Desiro UK für Grossbritannien. Elektrische Bahnen, 2003, no. 9, pp. 421 – 428.
2. Desiro RUS Sochi — Broschure. Siemens. 2014. 2 p.
3. Tsigler V., Mangler R. Desiro RUS — perspektivnyy elektropoezd dlya prigorodnykh perevozok v Rossii [Desiro RUS — a perspective train for commuter traffic in Russia]. Lokomotiv, 2012, no. 4, pp. 35 – 38.
4. Brzhezovskiy A. M., Tolmachev S. V., Arshintsev D. N., Smelyanskiy I. V. Vzaimodeystvie puti i podvizhnogo sostava EVS “Sapsan” (proekt Velaro RUS) [Interaction of track and EMU “Sapsan” (Velaro RUS project)]. Vestnik VNIIZhT [Vestnik of the Railway Research Institute], 2012, no. 1, pp. 3 – 8.
5. Brzhezovskiy A. M., Zavertalyuk A. V., Romen Yu. S. Normy dopustimogo vozdeystviya na put’ i metody ispytaniy podvizhnogo sostava [Norms of permissible impact on the way and test methods for rolling stock]. Zheleznodorozhnyy transport [Railway transport], 2015, no. 5, pp. 40 – 45.
6. Romen Yu. S. Dinamika zheleznodorozhnogo ekipazha v rel’sovoy kolee. Metody rascheta i ispytaniy [Railway vehicle dynamics in railway gauge. Methods for calculation and tests]. Moscow, VMG-Print Publ., 2014, 210 p.
7. L’vov A. A., Brzhezovskiy A. M., Kartsev V. Ya., Okun’ Ya. S. Rezervy povysheniya effektivnosti vysokoskorostnogo dvizheniya passazhirskikh poezdov [Reserves for increasing efficiency of highspeed passenger trains]. Podvizhnoy sostav i put’ v usloviyakh intensifikatsii raboty zheleznykh dorog. [Rolling stock and track in terms of intensification of the railway operation]. Sb. trudov. [Proc. of the Railway Research Institute]. Moscow, Transport Publ., 1989, pp. 118 – 124.
8. Verigo M. F., Krepkogorskiy S. S. Obshchie predposylki dlya korrektirovki pravil rascheta zheleznodorozhnogo puti na prochnost’ i predlozheniya po izmeneniyu etikh pravil [General preconditions for the adjustment of rules for calculating the strength of the track and proposals to change these rules]. Dinamicheskie issledovaniya puti i korrektirovka pravil rascheta zheleznodorozhnogo puti na prochnost’[Dynamic study ways and adjustment of rules for calculating the strength of the railway track]. Trudy TsNII MPS. [Proc. of the Central Research Institute works of the Ministry of the Railway Transport]. Moscow, Transport Publ., 1972, Vyp. 466, pp. 1 – 50.
9. Korolev K. P. Telezhechnye ekipazhi lokomotivov dlya povyshennykh skorostey dvizheniya [Bogie carriages of locomotives for high speeds]. Trudy VNIIZhT. [Proc. of the Railway Research Institute]. Moscow, Transzheldorizdat Publ., 1962, Vyp. 248, pp. 263 – 264.
Review
For citations:
Brzezhovskiy A.M., Arshintsev D.N., Smelyanskiy I.V., Tolmachev S.V., Kiryushin D.E. Setting of conditions for handling electric multiple units “Lastochka”. RUSSIAN RAILWAY SCIENCE JOURNAL. 2016;75(4):248-255. (In Russ.) https://doi.org/10.21780/2223-9731-2016-75-4-248-255