Preview

RUSSIAN RAILWAY SCIENCE JOURNAL

Advanced search

On the need to complement the norms on easement for gauge width

https://doi.org/10.21780/2223-9731-2017-76-1-45-50

Abstract

The current evaluation system of track geometry provides supervision of standards for graduation of the gauge and speed limits at excess of allowable values. At present maximum graduation of the gauge normalized in accordance with the standard operating Procedures for the current maintenance of railway track. This article discusses the shortcomings of the existing system of evaluation in terms of lateral track geometry. In order to overcome it, direction of improving current standards for estimating lateral track geometry is proposed and justified.On the basis of data on the track geometry parameters obtained from track measuring cars the analysis of interdependencies of lateral irregularity parameters for outer and inner rails in the curve was made using of the mathematical description of the parameters of rails lateral irregularities by identifying the length, amplitude and half-wave graduation. The presence of significant differences in the position of rails in the direction of the curves and larger lateral irregularities on the inner rail was estimated. The presence of patterns of length changes, amplitude and graduation of lateral irregularities is shown. Authors present results of the analysis of correlation parameters of lateral irregularities on the outer and inner rails in curved sections of the track. The presence of an average degree of correlation relationship of position of lateral position of outer and inner rails of curved sections is shown. The influence of the graduation of lateral irregularities on performance of rolling stock dynamics is given. Values of the graduation of lateral irregularities, unacceptable in terms of traffic safety, are established.

About the Authors

V. O. Pevzner
Joint Stock Company “Railway Research Institute” (JSC "VNIIZhT")
Russian Federation


B. N. Zenzinov
Joint Stock Company “Railway Research Institute” (JSC "VNIIZhT")
Russian Federation


K. V. Klement'ev
Joint Stock Company “Railway Research Institute” (JSC "VNIIZhT")
Russian Federation


References

1. Pevzner V. O., Belotsvetova O. Yu., Tret'yakov V. V., Tret'yakov I. V., Shapet'ko K. V. Sovershenstvovanie normativnykh dokumentov po otsenke sostoyaniya puti pri skorostnom dvizhenii [Improvement of normative documents on the evaluation of track condition in high-speed transport]. Put’ I putevoye khozyaystvo [Tracks and track facility], 2014, no. 12, pp. 2 – 6.

2. Pevzner V. O., Kochergin V. V., Belotsvetova O. Yu., Maksimov I. N. Voprosy garmonizatsii otechestvennykh i zarubezhnykh normativov ustroystva i soderzhaniya rel'sovoy kolei pri skorostnom i vysokoskorostnom dvizhenii [Harmonization issues of national and international standards for structure and maintenance of the track at express and high-speed traffic]. Problemy vzaimodeystviya puti i podvizhnogo sostava. Sb. tr. mezhdunarodnoy nauchno-prakticheskoy konferentsii [Proc. of the international scientific-practical conference "Problems of interaction of track and rolling stock"]. Dnepropetrovsk, DIIT Publ., 2013, pp.12 – 13.

3. Igon’kin S. N. O naturnykh nerovnostyakh [About natural irregularities]. Put’ I putevoye khozyaystvo [Tracks and track facility], 2015, no. 8, pp. 11 – 14.

4. Shutov A. P. Avtomatizatsiya izmereniy krivizny puti i proektirovanie vypravki plana po nepreryvnoy informatsii o ego sostoyanii [Automation of measurements of track curvature and design of plan correction by the continuous status information]. Voprosy proektirovaniya, stroitel'stva i rekonstruktsii zheleznykh dorog Sibiri i Dal'nego Vostoka. Mezhvuzovskiy sb. nauch. tr. [Proc. of the interuniversity. Problems of design, construction and reconstruction of railways of Siberia and the Far East]. Novosibirsk, NIIZhT Publ., 1983, pp. 98 – 103.

5. Kogan A. Ya., Petukhovskiy S. V. K voprosu o raschete polozheniya puti v plane po strelam nesimmetrichnoy izmeritel'noy khordy [On the question of calculating position of the track in the plan along the guideline of asymmetrical measuring chord]. Vestnik VNIIZhT [Vestnik of the Railway Research Institute], 2002, no. 1, pp. 26 – 28.

6. Klement’ev K. V. Rezul'taty analiza nekotorykh parametrov geometrii rel'sovoy kolei v krugovykh krivykh metodom poluvoln [Results of the analysis of some parameters of the track geometry in circular curves by the method of half-waves]. Tekhnicheskie nauki: teoriya i praktika. Sb. materialov mezhdunarodnogo nauchnogo simpoziuma [Proc. of the materials of the international scientific symposium "Engineering: Theory and Practice"]. Kirov, MTsNIP Publ., 2015, pp. 68 – 75.

7. Klement’ev K. V. Sovershenstvovanie metodov otsenki GRK [Improving evaluation methods of GRK]. Vnedrenie sovremennykh konstruktsiy i peredovykh tekhnologiy v putevoe khozyaystvo. [Introduction of modern designs and advanced technology to track facilities]. Moscow, ROAT Publ., 2014, pp. 75 – 80.

8. Garg V. K., Dukkipati V. R. Dynamics of Railway Vehicle Systems. New York, Academic Press, 1984, 407 p.


Review

For citations:


Pevzner V.O., Zenzinov B.N., Klement'ev K.V. On the need to complement the norms on easement for gauge width. RUSSIAN RAILWAY SCIENCE JOURNAL. 2017;76(1):45-50. (In Russ.) https://doi.org/10.21780/2223-9731-2017-76-1-45-50

Views: 731


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2223-9731 (Print)
ISSN 2713-2560 (Online)