Preview

RUSSIAN RAILWAY SCIENCE JOURNAL

Advanced search

Development of the system of rationing and accounting for performance indicators of long distance and commuter train schedules for railways and the network as a whole

https://doi.org/10.21780/2223-9731-2020-79-4-183-190

Abstract

Currently, rationing and accounting of performance indicators for long distance and commuter train timetables for railways is carried out on the basis of the principle of "achieved level". Methodology for calculating indicators based on objective conditions for organizing operational work on each railway has been developed. The generalized indicator characterizing the objective conditions is determined by the authors on the basis of an analysis of a set of factors, which include: loading of the railway infrastructure by train traffic; technical and technological state of infrastructure and rolling stock; risks associated with a possible delay of trains during the period of providing "windows" for the repair and reconstruction of infrastructure devices; number of passenger train stops; climatic conditions; technological discipline for fulfilling the traffic schedule (it is assumed to be the same for all railways); risks of violation of timetables on lines with dense train traffic. Dependencies for determining the numerical values of the factors are proposed. Taking into account the weight coefficients of each factor, the estimated indices of the objective conditions of the operation of each railway for long distance and commuter traffic are determined. The network task by the level of execution of schedules is distributed by railways in proportion to the values of their estimated indices.

The transition to the proposed system of rationing and accounting for the performance of timetables will help to improve the quality of performance of the train schedule, to ensure a positive image of the Russian Railways in the field of passenger transportation. The use of the proposed methodology for determining the target indicators of the schedules of long distance and commuter trains ensures that the real conditions of the transportation process on each railway are taken into account at the planning stage and allows an objective assessment of the quality of the organization of operational work based on the results of the fulfillment of planned targets.

About the Authors

M. I. Mekhedov
Joint Stock Company Railway Research Institute (JSC "VNIIZhT")
Russian Federation

Mikhail I. Mekhedov - Cand. Sci. (Eng.), Deputy General Director - Director of the Scientific Center "Digital transportation models and energy saving technologies" (SC "DTEM").

Moscow, 129626


E. A. Sotnikov
Joint Stock Company Railway Research Institute (JSC "VNIIZhT")
Russian Federation

Evgeniy A. Sotnikov - Dr. Sci. (Eng.), Professor, Chief Researcher.

Moscow, 129626



E. A. Mekhedova
Joint Stock Company Railway Research Institute (JSC "VNIIZhT")
Russian Federation

Evgeniya A. Mekhedova - Leading Process Engineer, Scientific Center "Digital transportation models and energy saving technologies" (SC "DTEM").

Moscow, 129626



References

1. Report of O. V. Belozerov, the General Director - Chairman of the Board of the Open Joint Stock Company "Russian Railways" at the extended final meeting of the Board of the JSC "Russian Railways". Zheleznodorozhnyy transport, 2020, no. 1, pp. 2-10 (in Russ.).

2. Report of O. V. Belozerov, the General Director - Chairman of the Board of the Open Joint Stock Company "Russian Railways" at the extended final meeting of the Board of the JSC "Russian Railways". Zheleznodorozhnyy transport, 2019, no. 1, pp. 4-12 (in Russ.).

3. Sherrat Ph., Miles T. Steady perfomance decline. Modern Railways, 2016, June, Vol. 73, no. 813, p. 13.

4. Mauvais jours pour la ponctualite des trains. La vie du Rail. Magazine, 2017, no. 3621, p. 9.

5. S-bahn Gamburga stavit rekord tochnosti [S-bahn Hamburg sets a record for accuracy]. Rail International, 2011, no. 2, p. 5.

6. Zimnie zaderzhki poezdov v Germanii [Winter train delays in Germany]. Rail International, 2011, no. 2, p. 2.

7. Levin D. Yu. Upravlenie ekspluatatsionnoy rabotoy na zheleznodorozhnom transporte: tekhnologiya i upravlenie rabotoy zheleznodorozhnykh uchastkov i napravleniy [Management of operational work in railway transport: technology and management of the work of railway sections and directions]. Moscow, Infra-M Publ., 2018, 368 p.

8. On approval of the methodology for the classification and specialization of railway lines of the JSC "Russian Railways". Order of the JSC "Russian Railways" dated 13 January, 2020 No. 28/r. URL: https://base.garant.ru/73573702 (retrieved on 15.04.2020) (in Russ.).

9. Otsenka tochnostipassazhirskikh soobshcheniy [Assessment of the accuracy of passenger traffic]. Rail International, 2017, no. 11, pp. 28-34.

10. Mekhedov M. I., Sotnikov E. A., Mekhedova E. A. Otsenka vliyaniya vypolneniya grafika dvizheniya poezdov na kachestvo passazhirskikh perevozok [Evaluation of the train schedule performance for the quality of passenger traffic]. Zheleznodorozhnyy transport, 2020, no. 8, pp. 4-8.


Review

For citations:


Mekhedov M.I., Sotnikov E.A., Mekhedova E.A. Development of the system of rationing and accounting for performance indicators of long distance and commuter train schedules for railways and the network as a whole. RUSSIAN RAILWAY SCIENCE JOURNAL. 2020;79(4):183-190. (In Russ.) https://doi.org/10.21780/2223-9731-2020-79-4-183-190

Views: 606


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2223-9731 (Print)
ISSN 2713-2560 (Online)