Streamlined break scheduling for major track repairs

https://doi.org/10.21780/2223-9731-2024-83-4-302-310

EDN: https://elibrary.ru/bcsmvn

Abstract

Introduction. Overhaul of railway track and routine maintenance of infrastructure requires interruptions in train traffic. This has a major impact on transport and at the same time is an integral part of it. Allocation of interruptions in traffic is based on the prioritisation of clearance for trains, which often complicates repairs of a given scope. The article considers ways to streamline break scheduling for railway repairs on heavy-traffic routes.

Materials and Methods. The research is based on the known theories of operational management of transportation, applied technologies of infrastructure repair, statistics of clearance for trains, repair scopes and variable train schedules. The paper uses methods for calculating the capacity of space intervals under repair, and theoretical justification of analytical formulas for calculating clearance for trains.

Results. The paper highlights calendar periods and redefines traffic capacity indicators and their calculation methods for determining the annual average daily throughput capacity. The article plots possible track overhaul schedules with different durations and different interruption patterns (breaks). The work shows the dependencies of the total duration of breaks and total clearance for trains during a calendar year under different repair patterns for selecting a variant under given conditions.

Discussion and conclusion. These dependencies help streamline the repair programmes considering repair volumes and clearance for trains at the scheduling stage. Automation of the process optimises labour costs for scheduling repairs.

About the Authors

Vyacheslav G. Fedulin
Railway Research Institute
Russian Federation

Vyacheslav G. Fedulin, Postgraduate, Technical Expert, Digital Models of Transportation and Energy Saving Technologies Research Centre,

10, 3rd Mytishchinskaya St., Moscow, 129626.

AuthorID: 1141172.



Mikhail I. Mehedov
Railway Research Institute
Russian Federation

Mikhail I. Mehedov, Cand. Sci. (Eng.), Deputy General Director, Director of the Digital Models of Transportation and Energy Saving Technologies Research Centre,

10, 3rd Mytishchinskaya St., Moscow, 129626.

AuthorID: 1019989.



Vladimir A. Antonets
TransBaikal Railway — branch of JSC “Russian Railways”
Russian Federation

Vladimir A. Antonets, Postgraduate, Head of the TransBaikal Railway,

34, Leningradskaya St., Chita, 672000.



Vladimir A. Ustinov
Railway Research Institute
Russian Federation

Vladimir A. Ustinov, Postgraduate, Technical Expert, Digital Models of Transportation and Energy Saving Technologies Research Centre,

10, 3rd Mytishchinskaya St., Moscow, 129626.

AuthorID: 1141173.



References

1. Albrecht V. G. Methodology of optimum slot selection and comparison of arrangements during track reconstruction and overhaul: manuscript. Moscow: MIIT; 1955. 145 p. (In Russ.).

2. Antonov Yu. A., Pechugin D. A. Ways to reduce operational losses when providing slots on heavy-traffic routes. In: Proceedings of the Railway Research Institute. Moscow; 1965. Issue 48. p. 13–27. (In Russ.).

3. Shenfeld K. P., Sotnikov E. A. Development of railway transportation management methods in modern conditions. Moscow: Nauchnyy mir Publ.; 2015. 202 p. (Proceedings of the Railway Research Institute). (In Russ.). EDN: https://elibrary.ru/vkanpp.

4. Levin D. Yu. Theory of operational transport management: monograph. Moscow: Uchebno-metodicheskiy tsentr po obrazovaniyu na zheleznodorozhnom transporte; 2008. 624 p. (In Russ.).

5. Os'minin A. T., Sotnikov E. A., Os'minin M. A. Methodical basis for organization of repair-track works on sections at long-term closures with providing them by "in transit" technology. Russian Railway Science Journal. 2017;76(1):25-30. (In Russ.). https://doi.org/10.21780/22239731-2017-76-1-25-30.

6. Mehedov M. I. Challenges of infrastructure repair on heavy-traffic routes. In: Kosarev A. B., Gogrichiani G. V. (eds.) Major issues of rail transport development: Proceedings of the All-Russian scientific and practical conference dedicated to the 75th anniversary of the postgraduate of the Railway Research Institute. Moscow: RAS Publ.; 2019. Vol. 2. p. 17–25. (In Russ.). EDN: https://elibrary.ru/wqvtfq.

7. Bogachev A. I. Organisation of traffic in conditions of track work. Moscow: Transzheldorizdat Publ.; 1955. 116 p. (In Russ.).

8. Bogachev A. I. Determination of optimum slot durations in the train schedule for the electrification of the double-track sections and the intermediate track repair. Russian Railway Science Journal. 1961;(1):46-50. (In Russ.).

9. Bogachev A. I. Feasibility study of slots in the traffic schedule used for track repair on double-track sections. Rostov-on-Don: RIIZhT; 1979. 16 p. (In Russ.).

10. Svetlakova E. N., Zernyaev D. V. New technologies for the management of clearance for trains during the summer track campaign. In: Transsib: ahead of the curve: Proceedings of the international scientific and practical conference, 6–7 October 2016, Chita. Chita; 2016. Vol. 1. p. 60–64. (In Russ.). EDN: https://elibrary.ru/wwbfpt.

11. Tolmachev V. N. Analysis of possible patterns of repair and track work sections. Transport: science, equipment, management. 2003;(5):36. (In Russ.).

12. Yakhimovich V. V., Nikulin N. A., Dmitrenko A. V. Efficiency of long-term slots. Zheleznodorozhnyy transport. 2000;(3):22-24. (In Russ.).

13. Paramonova N. V. Optimum for slot time. World of Transport and Transportation. 2007;(1):114-116. (In Russ.). EDN: https://elibrary.ru/kltpjf.

14. Kokurin I. M., Kattsyn D. V., Timchenko V. S. Determination of slot parameters when estimating transport prospects. World of Transport and Transportation. 2015;13(2 ):142-153. (In Russ.). EDN: https://elibrary.ru/sgurpc.

15. Antonets V. A., Mekhedov M. I., Fedulin V. G., Ustinov V. A. Special aspects of railroad infrastructure maintenance on heavy traffic directions. Pacific Rim countries transportation system. 2022;(3):24-28. (In Russ.). EDN: https://www.elibrary.ru/igtoey.


Review

For citations:


Fedulin V.G., Mehedov M.I., Antonets V.A., Ustinov V.A. Streamlined break scheduling for major track repairs. RUSSIAN RAILWAY SCIENCE JOURNAL. 2024;83(4):302-310. (In Russ.) https://doi.org/10.21780/2223-9731-2024-83-4-302-310. EDN: https://elibrary.ru/bcsmvn

Views: 204


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2223-9731 (Print)
ISSN 2713-2560 (Online)